- Sector
- Security
- Location
- Jurong, Singapore
- Scale
- PAS 68 / IWA 14-1
- Duration
- 4 months
- Year
- 2024
IWA 14-1 rated hostile-vehicle-mitigation wall and gate line for a hyperscale data centre.
The challenge
Stop a hostile vehicle at the approach to a critical facility while keeping legitimate access flowing — to a recognised impact rating.
Our approach
We installed an IWA 14-1 / PAS 68 rated barrier and gate line on engineered foundations, integrated with the site's access control.
The outcome
A rated vehicle barrier delivered and verified to the specified impact classification, with managed access maintained.
Project timeline
Month 1
Rating & foundation design
Impact rating confirmed and barrier foundations designed.
Months 2-3
Foundations
Engineered foundations cast to the tested specification.
Month 3
Barrier & gate install
Rated wall and gate line installed and integrated.
Month 4
Commissioning
Access-control integration and verification.