Critical-Facility Perimeter
← All projectsSecurity

Critical-Facility Perimeter

Houston, Texas, USA · 2022

Sector
Security
Location
Houston, Texas, USA
Scale
3.3 km perimeter
Duration
8 months
Year
2022

Layered perimeter — vehicle barrier, anti-climb fence and detection — for a coastal oil & gas terminal.

The challenge

Secure a coastal energy terminal against layered threats in a corrosive marine environment, without interrupting operations.

Our approach

We delivered a defence-in-depth perimeter — rated vehicle barrier, anti-climb fence and detection — using marine-grade materials and phasing to keep the terminal running.

The outcome

A layered, corrosion-resistant perimeter commissioned with no interruption to terminal operations.

Project timeline

  1. Months 1-2

    Threat assessment & design

    Layered-defence design with marine-grade specification.

  2. Months 2-6

    Vehicle barrier & fence

    Rated barrier and anti-climb fence installed in marine-grade materials.

  3. Months 6-8

    Detection & commissioning

    Detection integrated and the perimeter verified.

On site