- Sector
- Security
- Location
- Marina, Singapore
- Scale
- 140 m frontage
- Duration
- 3 months
- Year
- 2023
Shallow-mount PAS 68 bollard line protecting a public plaza.
The challenge
Protect a public plaza from vehicle threat without sterilising it — preserving pedestrian flow, sightlines and shallow services below.
Our approach
We used a shallow-mount PAS 68 bollard system suited to the constrained foundation depth, set out to keep desire lines and sightlines open.
The outcome
A rated bollard line that secures the frontage while the plaza still reads as open public space.
Project timeline
Month 1
Survey & setting out
Service survey and bollard setting-out to preserve pedestrian flow.
Months 1-2
Foundations & install
Shallow-mount foundations and rated bollards installed.
Month 3
Finishes & handover
Surface reinstatement and handover.