Bridge Jacking & Bearing Replacement
← All projectsCivil

Bridge Jacking & Bearing Replacement

Kuala Terengganu, Malaysia · 2021

Sector
Civil
Location
Kuala Terengganu, Malaysia
Scale
6-span bridge
Duration
5 months
Year
2021

Hydraulic jacking and bearing replacement on a live highway bridge.

The challenge

Replace failed bearings without fully closing a road carrying daily highway traffic.

Our approach

Synchronised multi-point hydraulic jacking under load, executed in controlled night windows with continuous structural monitoring.

The outcome

Bearings replaced with zero full closures and no disruption to daytime traffic.

Project timeline

  1. Months 1-2

    Inspection & design

    Bearing condition survey and jacking-scheme design with temporary supports.

  2. Month 2

    Temporary works

    Jacking points and structural monitoring installed.

  3. Months 3-4

    Jacking & replacement

    Night-window synchronised jacking and bearing replacement under load.

  4. Month 5

    Reinstatement & handover

    Lowering, verification and reinstatement to full traffic.