- Sector
- Building
- Location
- Woodland, California, USA
- Scale
- 4 storeys, 6,200 m²
- Duration
- 14 months
- Year
- 2023
Turnkey EPC construction of a four-storey commercial block.
The challenge
A single accountable delivery from groundworks to a commissioned, occupiable building on one contract.
Our approach
In-house design coordination of structure and MEP, with commissioning planned from day one rather than bolted on at the end.
The outcome
Delivered fully commissioned and handed over ready for fit-out.
Project timeline
Months 1-3
Design coordination
Structure and MEP coordinated to a buildable, commission-ready design.
Months 3-5
Substructure
Foundations, basement and ground-floor slab.
Months 5-9
Superstructure & envelope
Four-storey frame and façade, MEP rough-in concurrent.
Months 9-13
Fit-out & MEP
Internal fit-out and mechanical, electrical and plumbing installation.
Month 14
Commissioning & handover
Systems commissioned and the building handed over for fit-out.