Distribution Warehouse EPC
← All projectsBuilding

Distribution Warehouse EPC

Batam, Indonesia · 2021

Sector
Building
Location
Batam, Indonesia
Scale
9,500 m²
Duration
11 months
Year
2021

Engineer-procure-construct delivery of a high-bay distribution warehouse with office annex.

The challenge

A single-source EPC delivery on an island site where materials logistics and skilled-labour availability drove the programme.

Our approach

We front-loaded procurement and logistics, used a portal-frame system suited to local supply, and self-performed the structural and envelope scopes.

The outcome

The warehouse and annex were delivered complete with loading aprons, commissioned and handed over.

Project timeline

  1. Months 1-3

    Design & procurement

    EPC design fixed and long-lead materials shipped to the island.

  2. Months 3-6

    Earthworks & foundations

    Site formation, foundations and slab.

  3. Months 6-9

    Frame & envelope

    Portal frame erected and clad; aprons constructed.

  4. Months 9-11

    Fit-out & handover

    Office annex fit-out, services commissioned and handover.