- Sector
- Consultancy
- Location
- Los Angeles, California, USA
- Scale
- 11 storeys
- Duration
- 5 weeks
- Year
- 2022
Independent constructability and value-engineering review of a mixed-use scheme.
The challenge
An elegant design that does not reconcile with a buildable sequence becomes a stream of change orders once on site.
Our approach
We reviewed the design against a realistic construction sequence, surfaced clashes and access constraints early, and proposed value-engineering options that preserved design intent.
The outcome
The design team adopted the majority of recommendations, removing several high-risk sequence clashes before tender.
Project timeline
Week 1
Design intake
Drawings and specifications reviewed against site and access constraints.
Weeks 2-4
Sequence & clash review
Buildability, access and trade-sequence analysis with clash identification.
Week 5
VE options & report
Value-engineering options issued with cost and programme impact.