Mixed-Use Constructability Review
← All projectsConsultancy

Mixed-Use Constructability Review

Los Angeles, California, USA · 2022

Sector
Consultancy
Location
Los Angeles, California, USA
Scale
11 storeys
Duration
5 weeks
Year
2022

Independent constructability and value-engineering review of a mixed-use scheme.

The challenge

An elegant design that does not reconcile with a buildable sequence becomes a stream of change orders once on site.

Our approach

We reviewed the design against a realistic construction sequence, surfaced clashes and access constraints early, and proposed value-engineering options that preserved design intent.

The outcome

The design team adopted the majority of recommendations, removing several high-risk sequence clashes before tender.

Project timeline

  1. Week 1

    Design intake

    Drawings and specifications reviewed against site and access constraints.

  2. Weeks 2-4

    Sequence & clash review

    Buildability, access and trade-sequence analysis with clash identification.

  3. Week 5

    VE options & report

    Value-engineering options issued with cost and programme impact.