Controlled Demolition & Site Clearance
← All projectsBuilding

Controlled Demolition & Site Clearance

Los Angeles, California, USA · 2020

Sector
Building
Location
Los Angeles, California, USA
Scale
5,400 m² footprint
Duration
3 months
Year
2020

Controlled demolition of a redundant industrial structure and full site clearance.

The challenge

Bring down a structure on a constrained urban plot beside occupied neighbours, controlling dust, noise and vibration.

Our approach

A soft-strip followed by sequenced mechanical demolition with dust suppression and vibration monitoring, then segregation and recycling of arisings.

The outcome

The site was cleared and handed over level and certified for redevelopment, with the majority of material diverted from landfill.

Project timeline

  1. Month 1

    Surveys & soft strip

    Hazardous-materials survey and soft-strip of fittings.

  2. Month 2

    Structural demolition

    Sequenced mechanical demolition with dust and vibration control.

  3. Month 3

    Clearance & certification

    Arisings segregated and recycled; site certified clear.