Gabion Slope Protection
← All projectsEnvironmental

Gabion Slope Protection

Kuala Terengganu, Malaysia · 2021

Sector
Environmental
Location
Kuala Terengganu, Malaysia
Scale
320 m embankment
Duration
5 months
Year
2021

Gabion retaining structures and bioengineered slope protection above a road.

The challenge

Stabilise an eroding embankment threatening a road, using methods that tolerate movement and drain freely.

Our approach

We built gabion retaining structures with a free-draining backfill and planted the face for long-term reinforcement, keeping the road open under traffic management.

The outcome

The 320 m embankment was stabilised and the road protected, with the gabion face greening over as designed.

Project timeline

  1. Months 1-2

    Earthworks & drainage

    Slope trimming and subsoil drainage installed.

  2. Months 2-4

    Gabion construction

    Gabion baskets filled and tied with free-draining backfill.

  3. Month 5

    Planting & reinstatement

    Face planting and road reinstatement.